CRUZ511

Traveler Information for Santa Cruz County

  • Home
  • Drive
    • Traffic Conditions
      • Cruz511 Map
      • Traffic Cameras
      • Travel Alerts & Notices
    • Shared Rides
      • Carpooling
      • Vanpooling
      • Private Transport
    • Park and Ride
    • True Cost of Driving
    • Eco-driving
    • Alternative Fuels & Electric Vehicles
      • Electric Vehicles
      • Other Alt Fuels
    • Truck & Freight Info
  • Transit
    • Riding the Bus
    • Getting to Airports
    • Travel Out of Town
    • Accessible Transit
    • Transit Tips
  • Bike
    • Bike Map
    • Bikes on Transit
    • Workplace Bike Programs
    • Bike Safety
    • Bike Parking
    • More Bike Resources
  • Walk
    • Walking Safety
    • Walk Score
    • Walking Resources
  • More
    • GO Santa Cruz County
    • Report Bike & Pedestrian Hazards
    • Cruz511 In Your Neighborhood
      • Eastside Santa Cruz
      • Central Watsonville
    • Workplace Programs
      • Employer Help Desk
      • Green Business
      • Emergency Ride Home
      • Commute Plan Basics
      • Tax Benefits
    • Safety Laws
    • Emergency Services
    • Specialized Transportation
    • Save Trips
      • Alternative Schedules
      • Working Remotely
      • Trip Chaining
      • Virtual Travel
    • Recreational Travel
  • News
  • Home
  • GO Santa Cruz County
  • Drive
  • Transit
  • Bike
  • Walk
  • More
  • News
Español
Home / Alert / Highway 9 Traffic Control Continues Week of 9/21

Highway 9 Traffic Control Continues Week of 9/21

Published September 22, 2026

Highway 9 One-Way Reversing Traffic Control Continues During Week of September 21

Travelers on Highway 9 will encounter daytime and overnight one-way reversing traffic control Monday through Friday at multiple locations during the week of September 21.

Projects Under Construction

The Highway 9 San Lorenzo River and Kings Creek Bridge Replacement Project is taking place north of Boulder Creek and involves the full replacement of these bridges for the safety of the traveling public.

  • King’s Creek Bridge Replacement / Post Mile 15.41 to 15.55
  • San Lorenzo River Bridge Replacement / Post Mile 13.58 to 13.69

Temporary traffic signals at both bridges are in place providing 24/7 signalized one-way control. The one-way traffic control supports the ongoing bridge replacement work. Crews are working on the second phase of the Kings Creek Bridge project, replacing the northbound portion of the bridge. Crews are working on the first phase of the San Lorenzo River Bridge project, replacing the southbound portion of the bridge.

The Highway 9 Felton Pedestrian Safety Improvements Project:  Since the 1954 opening of San Lorenzo Valley High School, pedestrians have had to navigate to school along the narrow shoulders of Highway 9. This project will see a sidewalk and bikeable shoulder area built on the southbound side of Highway 9 between the schools complex and Felton’s downtown. During the current phase of construction, a temporary concrete barrier was installed closing one of the southbound lanes on Highway 9 approaching Graham Hill/Felton Empire Road. This barrier is essential for the safety of crews working behind it for all current phases of work and is expected to remain in place through February 2027. Please allow for extra time during your commute through this area. When complete, the project will provide transformative safety enhancements for pedestrians and cyclists for generations to come.

Monday, Sept. 21 through Friday, Sept. 25:

  • Work is taking place during the day behind a temporary k-rail barrier with one-way reversing traffic control on Hwy. 9 north of Graham Hill Rd, PM 6.5- 7.2. Work this week includes forming a retaining wall from PM 6.3 to 6.6. Also, drilling for a retaining wall from PM 6.5-6.6. As well as excavating driveways where the new sidewalk will be at PM 7.0 to 7.2 just north of Fall Creek Drive.

The Highway 9 Upper Drainage and Erosion Control Improvements Project is improving the operation of key drainage systems along Hwy. 9 and will include culvert replacement, paving, and enhancement of erosion control systems. This work will take place between Brookdale and the junction with upper Hwy. 236.

  • A temporary traffic signal is in place to establish 24/7 single lane reversible traffic control from 0.21 miles north of Clear Creek Road/Pacific Street to 0.32 miles south of Irwin Way PM 11.66. This traffic signal is estimated to operate through the end of September.

Monday, Sept. 21 through Friday, Sept. 24 from 7 am to 7 pm:

  • Approximately 0.4 miles of the northbound lane along Hwy 9 will be closed at Ramona Dr. (PM 17.51 – 17.95)

Monday, Sept. 21-Friday, Sept. 24 from 9 am to 4 pm:

  • Approximately 200 ft. of the northbound lane along Hwy 9 will be closed at Spring Creek Rd. (PM 15.03 – 15.06)
  • Approximately 1.5 miles of the northbound lane along Hwy 9 will be closed at Tin Can Ranch Rd (PM 23.75 – 25.5)
  • Approximately 0.25 miles of northbound lane along Hwy 9 will be closed near the Hwy 236 interchange near Old Mill Road.

Traffic Control for Utility Work and Tree Trimming:

  • September 19 / Post Mile 17.7 to 18.2 from 8:30 am – 4:30 pm
  • September 21 / Post Mile 15.97 to 16.73 from 9 am – 3 pm
  • September 21 / Post Mile 20.827 to 23.75 from 9 am – 3 pm
  • September 22 / Post Mile 23.75 to 25.5 from 9 am – 3 pm
  • September 21-23 / Post Mile 23.37 to 24.68 from 9 am – 2 pm
  • September 24-25 / Post Mile 24.68 to 23.37 from 9 am – 2 pm
  • September 25 / Post Mile 6.07 to 6.11 from 3:30 pm – 4 pm

Traffic Control for Guardrail Repairs from 9 am – 1:30 pm:

  • September 21 through 24 / Post Mile 9.25 to 10.17

Message and directional signs will alert travelers in advance of the areas under traffic control. Please allow for extra time for your travels through the area.

You can find a more in-depth timeline for the San Lorenzo Valley projects at this link: San Lorenzo Valley Area Projects Fact Sheet

Road information and updates can also be found on Caltrans District 5 Social Media platforms: X/Twitter at: @CaltransD5, Facebook at: Caltrans Central Coast (District 5) and Instagram at: Caltrans_D5.

Our crews deserve to get home safely too. Drive slowly and carefully in work zones.

CHP Traffic Incident Information Page

Traveler Information

<< Previous Post

Attention Employers

We are offering an array of free bike encouragement workshops to area employers. Sign up to give you team the knowledge and tools they need to change up their commute and receive incentives for doing so. Request a meeting today by calling 831.429.POOL or sending an email to info@cruz511.org

News Archives

Places to Go

  • School & Colleges
  • Airports
  • Attractions

Resources

  • Cruz511 Map
  • Workplace Programs
  • Emergency Services
  • Safety Laws

About

  • About Cruz511
  • Contact Us
  • Partners

Join Our Mailing List!

  • This field is for validation purposes and should be left unchanged.

Cruz511 is a service of the Santa Cruz County Regional Transportation Commission and is partially funded by Measure D.