Final Paving and Striping on Highway 9 Between Felton and Ben Lomond Continues with Traffic Control A major maintenance paving project continues on Hwy. 9 between El Solyo Heights Dr. in Felton and California Dr. in Ben Lomond. Travelers on Hwy. 9 between Felton and Ben Lomond will encounter ...
Highway 9 Traffic Control Continues 12/19
Final Striping on Highway 9 Between Felton and Ben Lomond Continues with Traffic Control and Significant Delays A major maintenance paving project continues on Hwy. 9 between El Solyo Heights Dr. in Felton and California Dr. in Ben Lomond. Travelers on Hwy. 9 between Felton and Ben Lomond will ...
Highway 1 Overnight Closures Continue 12/17-12/19
Overhead Sign Structure Installation on Highway 1 Project Between 41st and Soquel Continues with Overnight Closures Construction continues on a project to add north and southbound auxiliary lanes and bus-on-shoulder improvements on Highway 1 between the 41st Avenue and Soquel Drive interchanges and ...
Highway 1 Daytime Ramp and Overnight Lane Closures 11/17 – 11/22
Highway 1 Bus-On-Shoulder Project Between 41st and Soquel Continues with Daytime Ramp and Overnight Lane Closures Construction continues on a project to add north and southbound auxiliary lanes and bus-on-shoulder improvements on Highway 1 between the 41st Avenue and Soquel Drive interchanges and ...
Fishhook Overnight Closure 10/14
Deck Paving to Result in Full Overnight Closure of Fishhook Connector at Junction of Highways 1 and 17 in Santa Cruz on Thursday November 14 from 7 Pm to 6 Am A concrete pour on the bridge deck of a recently installed girder at the ‘Fishhook’ connector at the junction of Highway 1 and Highway 17 in ...