CRUZ511

Traveler Information for Santa Cruz County

  • Home
  • Drive
    • Traffic Conditions
      • Cruz511 Map
      • Traffic Cameras
      • Travel Alerts & Notices
    • Shared Rides
      • Carpooling
      • Vanpooling
      • Private Transport
    • Park and Ride
    • True Cost of Driving
    • Eco-driving
    • Alternative Fuels & Electric Vehicles
      • Electric Vehicles
      • Other Alt Fuels
    • Truck & Freight Info
  • Transit
    • Riding the Bus
    • Getting to Airports
    • Travel Out of Town
    • Accessible Transit
    • Transit Tips
  • Bike
    • Bike Map
    • Bikes on Transit
    • Workplace Bike Programs
    • Bike Safety
    • Bike Parking
    • More Bike Resources
  • Walk
    • Walking Safety
    • Walk Score
    • Walking Resources
  • More
    • GO Santa Cruz County
    • Report Bike & Pedestrian Hazards
    • Cruz511 In Your Neighborhood
      • Eastside Santa Cruz
      • Central Watsonville
    • Workplace Programs
      • Employer Help Desk
      • Green Business
      • Emergency Ride Home
      • Commute Plan Basics
      • Tax Benefits
    • Safety Laws
    • Emergency Services
    • Specialized Transportation
    • Save Trips
      • Alternative Schedules
      • Working Remotely
      • Trip Chaining
      • Virtual Travel
    • Recreational Travel
  • News
  • Home
  • GO Santa Cruz County
  • Drive
  • Transit
  • Bike
  • Walk
  • More
  • News
Español
Home / Alert Archive / Traffic Safety Improvements on Highway 17 begin 9/13

Traffic Safety Improvements on Highway 17 begin 9/13

Published September 14, 2021

Pavement Rehabilitation Project and Lane Closures on State Route 17 Between Herbard Road and Interstate 280, Santa Clara County

Santa Clara County– Caltrans will begin a pavement rehabilitation project along State Route 17 (SR-17), from Herbard Road, to Interstate 280 (I-280), in Santa Clara county. Construction activities will include cold plane and overlay with Rubberized Hot Mix Asphalt (RHMA), slab replacement with rapid strength concrete to improve ride quality, and Americans with Disabilities (ADA) curb ramps upgrades at 42 existing and 4 new locations. Work is scheduled to begin the week of September 13 and will continue until 2023.

Nearby businesses and residents will experience normal construction noise which will be monitored. Work is weather permitting. The schedule and times are subject to change.

Work Schedule and Lane Closures:

Northbound:

  • Monday through Friday: 8:00 PM to 6:00 AM
  • Friday through Saturday: 8:00 PM to 9:00 AM
  • Saturday through Sunday: 8:00 PM to 10:00 AM
  • Sunday through Monday: 8:00 PM to 6:00 AM

Southbound:

  • Monday through Friday: 8:00 PM to 6:00 AM
  • Friday through Saturday: 8:00 PM to 8:00 AM
  • Saturday through Sunday: 7:00 PM to 9:00 AM
  • Sunday through Monday: 6:00 PM to 6:00 AM

Message and directional signs will be in place to assist motorists traveling in the area. Motorists are advised to expect delays and allow extra time for their commute. For 24/7 traffic updates follow 511.org: https://twitter.com/511SFBAY. For real-time traffic, click-on Caltrans QuickMap: https://quickmap.dot.ca.gov/

Attachment: Traffic Advisory Pavement Rehab SR-17 San Jose, Campbell, Los Gatos

<< Previous Post
Next Post >>

Attention Employers

We are offering an array of free bike encouragement workshops to area employers. Sign up to give you team the knowledge and tools they need to change up their commute and receive incentives for doing so. Request a meeting today by calling 831.429.POOL or sending an email to info@cruz511.org

News Archives

Places to Go

  • School & Colleges
  • Airports
  • Attractions

Resources

  • Cruz511 Map
  • Workplace Programs
  • Emergency Services
  • Safety Laws

About

  • About Cruz511
  • Contact Us
  • Partners

Join Our Mailing List!

  • This field is for validation purposes and should be left unchanged.

Cruz511 is a service of the Santa Cruz County Regional Transportation Commission and is partially funded by Measure D.